Field services

On-site testing and diagnostics.

Certified field teams testing transformers, generators, and cables wherever you operate.

Testing modes
Online & offline

In service, or during a planned outage

Voltage classes
LV · MV · HV

Motors, transformers, cables, switchgear

Mobilised from
Three branches

Dammam, Riyadh and Jeddah

The service

We bring the test set to your plant

Offline and online testing for transformers, motors, generators, switchgear and power cables — carried out on site.

What you need depends on whether the machine can be stopped, and whether you are chasing a fault or planning capital. Online testing tells you what is developing while the machine runs. Offline testing tells you the real condition of the insulation and windings, but needs an outage.

Life assessment sits alongside either, answering the harder question of how much service life is left and whether to repair or replace.

Every visit ends with a written report, not a verbal handover. It records measured values against acceptance limits and separates what needs attention now from what should simply be watched on the next route.

Why it matters
  • Online testing with no outage required
  • Offline testing during your planned shutdown
  • Report with values against acceptance limits
  • Handover to our own workshop if a rewind is needed
Capabilities

What we do

Each item below is work we carry out in house. If your requirement is not listed, send the details and we will tell you plainly whether we cover it.

01

Transformers

Power and distribution units, including on-site overhaul where the asset cannot travel.

  • Dissolved gas analysis
  • Oil sampling
  • Frequency response
  • Turns ratio
  • Vector group
02

Motors

AC and DC machines across all sizes and voltage ratings.

  • Insulation resistance
  • Polarisation index
  • Surge comparison
  • Winding resistance
03

Generators

AC and DC sets, including rotor and stator condition assessment.

  • Insulation resistance
  • Polarisation index
  • Surge comparison
04

Turbo generators

High-speed sets needing rotor-dynamic attention.

  • Vibration analysis · ISO 10816
  • Bearing condition
  • Rotor dynamic balancing
05

Power cables

Medium and high voltage runs, including fault location.

  • Tan delta
  • Partial discharge mapping
  • Sheath integrity
  • Fault location
06

Switchgear

LV and MV panels and breakers, tested under load where possible.

  • Contact resistance
  • Timing tests
  • Thermal imaging
Capability

This is one of five

Scroll across — most plants use two or three together.

01

Workshop Services

Motor rewinding and overhaul to 13.8 kV, returned with a test certificate.

02

Condition Monitoring

Predictive programmes to SKF standards that trend your critical assets.

03

Hydraulic Services

Power units, cylinders, pumps and DROPSA centralised lubrication.

04

Crane LMI Systems

WIKA load moment indicators, calibration and load testing.

Book a site visit

Send the asset list and nameplate photos. We will confirm the test scope, whether you need an outage, and the crew time before you commit.